Cek dan Pastikan
- Compare cable size, type and tagging with the cable schedule. Ensure core identification match with connection diagram and phase sequence
- Check the glands certificate meet the area classification as mentioned in spec
- Inspect the glands cable for tighness and good workmanship; correct type and size of cable installed. Check the outdoor glands have been wrappen in vulcanising tape
- Ensure the gland plates for all single cables have been manufactured from non magnetic materials
- Pastikan conductors are terminated using crimped connections. check correct size and type of crimping lugs has been used
- Before making any measurement, inspector should ensure both ends of the cable has been disconnected and are clear of any metal
- Cek the earth connection
Insulation Resistance Test
For LV multicore measurement shall be
- core to core
- core to earth
- screen to armour